USDC Logo
Premium Data Center Solutions

Deploy AI Infrastructure
in Months Not Years

We specialize in building and managing state-of-the-art data centers, providing infrastructure solutions tailored for the evolving needs of the digital economy.

1-50MW+Power Capacity
4 MonthsDeployment Timeline
TIER IIIDesign Standard
100%AI Ready

Engineered forperformance.Built for efficiency.

Purpose-built infrastructure and optimized design deliver faster time-to-online and lower total cost of ownership.

10xFaster Deployment

Modular ARMS 200 pods enable delivery in weeks, not years, getting you to compute faster.

N+1Enterprise Reliability

Redundant power, cooling and network architecture delivers Tier III uptime and resilience.

50MW+Scalable Capacity

Existing and planned capacity pipeline supports long-term growth and expansion.

COLUMBIANA, ALABAMA CAMPUS

Inside the Company’s AI Infrastructure Campus in Columbiana, Alabama

Purpose-built for the next generation of high-performance computing and artificial intelligence.

The deployment features DigiPower X’s modular ARMS 200 infrastructure, engineered to support NVIDIA B300 GPUs with advanced direct-to-chip liquid cooling, high-density power delivery, resilient infrastructure and modular scalability.

A video from DigiPower X on YouTubeWatch on YouTube
AI INFRASTRUCTURE STACK

From Power to AI Compute

USDC delivers the complete infrastructure stack required for
next-generation AI deployment.

Power Infrastructure

Grid-Connected Energy Assets Designed For Large-Scale AI Growth.

Cooling & Network

Direct-To-Chip Cooling And High-Speed Networking For
Dense Workloads.

GPU Compute

NVIDIA-Ready Environments Optimized For Training And Inference.

AI Applications

Enterprise AI, Cloud Services, Inference Platforms
And Advanced Research.

THE OPPORTUNITY

AI Demand isOutpacingInfrastructure

The Global demand for data center capacity is expected to rise at an annual rate between 19% and 22% from 2023 to 2030 to reach a yearly demand of 219 Gigawatts. At USDC, we stand poised to capitalize on these secular trends by taking existing energy assets and converting them into Tier III HPC data center's at a fraction of the cost when compared to the competition.

219GW
PROJECTED DEMAND BY 2030
+22%
ANNUAL GROWTH (CAGR)
4x
INCREASE IN AI WORKLOADS
4 MONTHS
USDC DEPLOYMENT

BUILT FOR
AI INFRASTRUCTURE EXCELLENCE

Stay ahead of the curve with the latest developments from USDC - your trusted partner in digital infrastructure.

1.

POWER ADVANTAGE

1-50MW+ capacity with strategic energy assets positioned for long-term AI infrastructure growth.

2.

RAPID DEPLOYMENT

Deploy AI-ready
Infrastructure in weeks
Instead of years.

Traditional Data Center24 Months
USDC Infrastructure4 Months
3.

ADVANCED COOLING

Direct-to-chip cooling engineered for dense AI workloads.

4.

AI OPTIMIZED

Built for Blackwell,
Vera Rubin and
future GPUs.

5.

ENTERPRISE GRADE

  • Tier III Design
  • 99.99% Reliability
  • Security & Compliance
GPU PLATFORM SUPPORT

CHIP-AGNOSTIC.ARCHITECTURE-READY.

ARMS 200 provides a high-density infrastructure foundation designed to adapt to evolving accelerator architectures, enabling flexible deployment as compute platforms evolve.

BLACKWELL platform details
GRACE BLACKWELL platform details
VERA RUBIN platform details
POWER READY
DIRECT-TO-CHIP COOLING
GPU OPTIMIZED
HIGH-SPEED NETWORKING
ENTERPRISE SECURE
CLOUD INTEGRATED
OCI COMPATIBLE
99.99% RELIABLE
NEXT-GEN ARCH
ULTRA-DENSE CORES
3D STACKED MEMORY
FUTURE READY
01

BLACKWELL

Optimized for high-density AI training and large-scale inference workloads.

02

GRACE BLACKWELL

Purpose-built infrastructure supporting enterprise-scale AI deployment.

03

VERA RUBIN

Future-ready architecture designed for the next generation of AI compute.

200KW+PER RACK
DLCLIQUID COOLING
100%AI READY
4 MonthsDEPLOYMENT
COOLING WITHOUT WATER CONSUMPTION

Water-Free Cooling for High-Density Compute.

Our modular data center solution is designed to operate without evaporative cooling, eliminating the continuous water consumption associated with traditional data center cooling systems.

Using a closed-loop liquid cooling architecture, coolant is continuously recirculated through the system rather than consumed. This enables highly efficient heat removal while requiring no ongoing water consumption for cooling.

USDC Closed-Loop Liquid Cooling System — High-density compute racks with closed loop recirculating coolant and zero water consumption

The result is a more environmentally responsible infrastructure platform with:

No evaporative cooling

No ongoing water consumption for cooling

Closed-loop liquid cooling

Reduced environmental impact

Greater deployment flexibility in water-constrained regions

By eliminating reliance on evaporative cooling, our modular platform delivers high-density AI and HPC cooling without placing additional demand on local water resources.

INTELLIGENT TELEMETRY

USDC DCIM Telemetry

Datacenters operate at sub-millisecond precision. Our proprietary Data Center Infrastructure Management (DCIM) dashboard coordinates thermal loads, chiller configurations and server rack power levels dynamically to prevent anomalies and maximize compute density.

USDC DCIM Cooling Loop Telemetry Dashboard
LIVE TELEMETRY
LIQUID COOLING MANIFOLD

Closed-Loop Cooling Telemetry

Live schematic tracking of chiller piping, water tank levels, heat exchanger performance and pressure/temperature sensor array telemetry. System logs monitor chiller modes and pump flow rates in real-time.

Water Tank Level0.6m
Chilled Water Flow15.52 m³
Cooling ModeChiller Cooling
PARTNER WITH US

READY TO OWN THE AI INFRASTRUCTURE LAYER?

Whether you need co-location, a turnkey data center build, or bare-metal GPU compute - USDC provides the infrastructure, the scale and the team to deliver.

BUILD THE FUTURE.

POWER THE INTELLIGENCE ERA.

SCALE WITHOUT LIMITSPurpose-built facilities designed to grow with your ambitions.
PERFORMANCE WITHOUT COMPROMISEHigh-density power, advanced cooling and elite connectivity
for AI at scale.